Karis Samuelson Idowu and her husband, Jarvis, remodeled a bathroom they described as strange, dark and affected by black mold. They removed the shower walls, built a custom raised trough sink and finished the space in Tadelakt plaster, hiring a specialist after struggling to seal the material themselves.
Karis Samuelson Idowu and her husband, Jarvis, have turned a bathroom they described as strange and dark into a more open space finished in Tadelakt plaster, after finding black mold and deciding to change the room’s layout. The couple did much of the demolition themselves, reused the old shower glass and brought in a specialist when they could not properly seal the plaster.
Get furniture and decor delivered free with Prime
- Fast, free delivery on millions of items
- Prime Video, Amazon Music and more included
- Member-only deals all year
The couple wanted enough room for both of them to use the bathroom at once and felt that a shower wall at the far end was blocking light. The discovery of black mold added another reason to remove the existing finishes and start over. Idowu said the previous room had mismatched surfaces, including stone tile on the main floor and pebble-style tile in the shower.
After settling on a design, the couple handled the demolition themselves. Idowu said they completed it in a weekend and described the work as “super fun and super messy.” She said a contractor’s initial estimate was $12,000 for demolition and trash removal, with the work expected to take five days and involve three or four workers. The couple’s account does not say what they ultimately spent on the full renovation.
Removing the shower walls changed how the room felt, Idowu said, making it “big and bright.” The couple kept the existing shower glass, framed the shower and built a custom raised trough sink with two faucets, designed in part around Jarvis’s height of 6 feet 5 inches. Two irregularly shaped mirrors, white lights and wall-mounted faucets completed the vanity area.
An Unusual Bathroom Gets a Surprising Renovation
Karis Samuelson Idowu and her husband, Jarvis, opened up a dark, mold-affected bathroom with a layout designed for shared use.
A more open shared space
The couple wanted room for two and felt the shower wall blocked light.
- Strange, dark layout
- Mismatched floor and shower tile
- Black mold found by the couple
- Shower walls removed; existing glass reused
- Custom raised trough sink with two faucets
- Open shower finished in Tadelakt plaster
Who did the work?
The renovation mixed hands-on work with specialist help.
The couple handled demolition themselves over a weekend.
A friend and his wife helped with waterproofing and cementing.
After struggling to seal the Tadelakt, they hired a specialist to finish it.
What the account leaves open
The published story describes the result but does not settle key cost and construction questions.
Final cost not reported
The $12,000 figure was an initial demolition quote, not the full renovation budget.
Remediation details missing
The account does not explain the mold’s extent, removal, testing or professional assessment.
A More Open Plan, Built Around Two Users
The renovation shows how changing a bathroom’s layout can matter as much as replacing its finishes. For this couple, removing the shower walls addressed their stated concerns about limited space and blocked light, while the double-faucet sink was tailored to shared use. Those choices are specific to the room and the homeowners; they do not establish that the design would suit every bathroom.
The project also illustrates a boundary in do-it-yourself renovation. The couple saved on demolition by doing it themselves, but the finish required specialist help after they realized they had not sealed it properly. Because plaster in a bathroom must withstand moisture, the couple’s experience underscores that a visually successful finish depends on correct preparation and waterproofing. The report does not provide technical instructions or verify the room’s construction beyond the homeowners’ account.
Products Worth Considering

Samsung 55-Inch M70H Series 4K HDR Mini-LED Smart TV with HDMI Cable and 12-Month CPS Warranty

Roborock Qrevo S Pro Robot Vacuum and Mop with 18,500 Pa Suction

Roborock Q7 M5+ Robot Vacuum and Mop with Self-Emptying Dock
As an affiliate, we earn on qualifying purchases.
From Mismatched Tile to Tadelakt
Before the work, the bathroom combined different tile styles and had a shower wall that the couple felt limited both light and usable space. They developed a design direction before demolition, then asked their friend Martin and his wife to help with waterproofing and cementing. Once those layers had dried, the couple applied Tadelakt, a Moroccan-style plaster finish.
Idowu said the material proved difficult for first-timers. After trying a layer or two, the couple realized they were not sealing it correctly and hired a specialist, identified in the account as Gary, to use the remaining material and complete the sealing. Idowu later said she would bring in the specialist from the beginning if she did the project again. Apartment Therapy reported that she was pleased with the final result and quoted her describing the bathroom as a “cement box” on Instagram.
““We wanted more space so the both of us could be in the bathroom at the same time.””
— Karis Samuelson Idowu, as quoted by Apartment Therapy
Costs, Timing and Mold Remediation
The published account leaves several practical details unspecified. It gives the $12,000 demolition quote, but not the couple’s final project budget, the cost of the specialist or how much the reused glass and DIY work reduced expenses. It also does not state when the renovation took place or how long the full project lasted beyond the reported weekend of demolition.
Although Idowu said the couple found black mold, the account does not explain how extensive it was, whether testing was done, how it was removed or whether a professional assessed the affected area. It likewise does not independently confirm the completed waterproofing or describe permits, inspections or other construction checks. The reported outcome and descriptions of the work come from the homeowners’ account as presented by Apartment Therapy.
No Further Project Plans Reported
Apartment Therapy’s account describes a completed renovation and does not report a planned next phase, additional work or a follow-up inspection. Idowu said she was happy with the result, while noting that she would have hired the Tadelakt specialist earlier if doing the project again. Any future updates about the bathroom’s upkeep, performance or costs have not been reported.
Source: Apartment Therapy
Key Questions
What was unusual about the bathroom before the renovation?
The couple described it as a strange space with mismatched tile, a shower wall they felt blocked light and a layout that did not give them enough room to use it together. They also said they found black mold.
What is Tadelakt?
Apartment Therapy described Tadelakt as a Moroccan-style plaster. The couple used it as the bathroom’s finish after the waterproofing and cementing work, but hired a specialist when they had trouble sealing it correctly.
How much did the renovation cost?
The couple said their first quote was $12,000 for demolition and trash removal. The published account does not give the final cost of the renovation or the amount they spent on materials and specialist work.
Did the couple do the work themselves?
They handled the demolition themselves and built a custom vanity, while a friend and his wife helped with waterproofing and cementing. They later hired a Tadelakt specialist to finish sealing the plaster.